FOR CRUDE OIL PRODUCTION AND TREATMENT FACILITIES
■ Process study for the optimization of the Xan Field surface facilities. Perenco Guatemala.- Study to identify bottlenecks.
Process study to simulate the current operation of Xan field, establish bottlenecks and perform runs to simulate the increase in water from 130,000bwpd to 200,000bwpd and its behavior in the primary separation phase.

■ Process study for the optimization of surface facilities for Villano A. Agip Oil Ecuador. Development of bottleneck identification studies.
Evaluation of the maximum capacity for water separation and re-injection in the surface facilities at Villano A wellpad.
Identification of bottlenecks, evaluation of alternatives, equipment sizing and implementation work.
